bos
The average cost of large-scale solar projects in India declined by 8.1% year-over-year in Q2 of 2023. Continuing from the previous quarter, the cost reduction was...
NLC India (NLCIL) has invited bids for the balance of system (BOS) works for 600 MW grid-connected solar power projects at Khavda, Gujarat. The last date for the...
SJVN Green, a wholly-owned subsidiary of SJVN, has invited bids for the balance of system (BOS) package to set up two grid-connected solar power projects with a total...
NLC India has invited bids for the balance of system (BoS) package to set up a 50 MW solar power project in the mined-out land of NLC India’s Mine II in Nevyeli,...
NTPC Renewable Energy has invited bids for the balance of system (BoS) package with land for interstate transmission system (ISTS)-connected solar projects up to 1,000...
NTPC Renewable Energy, a wholly-owned subsidiary of NTPC, has invited bids for the balance of system (BoS) package of interstate transmission system (ISTS)-connected...
NTPC Renewable Energy, a wholly-owned subsidiary of NTPC, has invited bids for the balance of system (BoS) package to develop 1,200 MW (4 X 300 MW) of solar power...
SJVN Green Energy, a wholly-owned subsidiary of SJVN, has invited bids for the supply of balance of system (BoS) and three years of comprehensive operation and...
At a time when the solar industry had started to gain momentum, with 2022 expected to be one of the best years in terms of installations, the increase in domestic module...
Bharat Heavy Electricals Limited (BHEL) has issued a notice inviting tender for the design, supply, installation, and commissioning of the balance of systems (BoS) for a...
In 2021, the share of string inverters in solar installations overtook India’s central inverters. Sungrow was the top solar inverter supplier in 2021 and the top...
Larsen & Toubro, Amara Raja Group, and Jakson Group were declared winders in NTPC‘s auction for a balance of systems (BoS) package for the 735 (3*245) MW Nokh...
NTPC Renewable Energy Limited (NTPC REL) has invited bids for a balance of system (BoS) package with land for 300 MW of inter-state transmission system (ISTS)-connected...
NTPC Limited has reissued a tender for a balance of system (BOS) package for the 735 (3×245) MW Nokh solar power project in Rajasthan. The average annual turnover...
Bharat Heavy Electricals Limited (BHEL), a public sector undertaking, has invited bids for the supply of balance of system (BoS) package for the 100 MW solar power...
1
2
3
...
3