Rising electricity costs are encouraging energy-intensive manufacturing companies in the textiles sector to make use of their rooftop spaces to install solar systems and meet part of their daytime power needs.

Tamil Nadu-based R Ps Spinner has installed a 440-kW rooftop solar system at its manufacturing facility in Udumalpet in Tiruppur district. The textile company is expected to save about ₹4 million (~$43,076) annually on electricity costs with this system.

The project, executed by CPV International, was commissioned on November 6, 2026.

The rooftop solar project is estimated to generate approximately 598,400 units of electricity annually, assuming a daily generation of four units per kW of installed capacity and 340 operational days.

At an electricity cost of ₹7 (~$0.0754)/kWh, R Ps Spinner is likely to save about ₹4.19 million (~$45.123) annually through solar power generation.

The rooftop solar project utilizes RenewSys’ 620 Wp N-type tunnel oxide passivated contact (TOPCon) bifacial solar modules and Solis solar inverters.

The project incorporates balance-of-system components from multiple manufacturers, with provisions for ease of maintenance and long-term operational reliability.

Direct current (DC) solar cables were sourced from LAPP India, while alternating current (AC) power cables were supplied by Polycab India.

The project also utilizes AC and DC distribution boxes from Trinity Touch and MC4 connectors from Stäubli.

Magnelis walkways and handrails supplied by SunRack Technologies were installed to provide safe rooftop access for routine inspection, cleaning, and maintenance.

One of the key challenges during project execution was the condition and inclination of the spinning mill’s roof.

The facility’s asbestos roof had to be replaced with JSW metal roofing sheets before the solar installation could commence. As a result, work was completed in three days.

The roof had an inclination of approximately 16 to 17 degrees. The installation team also had to contend with rainfall during project execution.

Despite these challenges, the installer completed the rooftop solar installation in 25 days, excluding the time required for roof replacement.

Spinning mills are energy-intensive manufacturing facilities, with electricity needs driven by machinery, ventilation, humidification, and other production processes.

Rooftop solar gives them the opportunity to use existing roof space to generate electricity.

However, the structural suitability of industrial roofs, particularly at older manufacturing facilities, remains an important consideration when planning rooftop solar investments.

The successful commissioning of this project demonstrates how roof refurbishment can be integrated into rooftop solar installations at existing industrial facilities.

According to Mercom’s Q2 and 1H 2026 India Rooftop Solar Market Report, India added 6.6 GW of rooftop solar capacity in the first half (1H) of calendar year 2026, up 131% from the 2.8 GW installed in 1H 2025. Residential installations accounted for 84% of total additions. Industrial installations accounted for 10%, followed by commercial installations at 5%, and government installations at 1%.

Mercom India hosts a multi-city Clean Energy Meet series to bring renewable energy developers, vendors, and C&I energy consumers to the same platform, helping them share insights on rooftop solar, open access, and other modes of clean energy procurement. The next event in the series will be held in Pune, Maharashtra, on November 27, 2026.

RELATED POSTS

Get the most relevant India solar and clean energy news.

RECENT POSTS