Mercom Insider

Bihar Draft Grid Code Proposes Primary Frequency Response for Renewables

Stakeholders can submit their feedback comments and objections to the draft Grid Code by September 4, 2026

thumbnail

Follow Mercom India on WhatsApp for exclusive updates on clean energy news and insights


The Bihar Electricity Regulatory Commission (BERC) has proposed that wind and solar projects with battery energy storage systems (BESS), with capacities above 10 MW and connected at 33 kV or higher, must be capable of increasing their output to at least 105% of the operating level and up to 105% or 110% of their Maximum Continuous Rating (MCR), to provide primary response when grid frequency falls.

Mercom Insider

Where clean energy's most influential leaders get their intelligence

Exclusive reporting, market intelligence, and insider access that shapes billion-dollar decisions in renewable energy and clean technology.

RELATED POSTS

Get the most relevant India solar and clean energy news.

RECENT POSTS