Andhra Pradesh Power Regulator Rules Intrastate Connectivity Project-Specific
It noted that any transfer of connectivity must be examined on a case-by-case basis
June 17, 2026
Follow Mercom India on WhatsApp for exclusive updates on clean energy news and insights
The Andhra Pradesh Electricity Regulatory Commission (APERC) has clarified that connectivity granted under the intrastate transmission system (InSTS) is project-specific and cannot be treated as a freely transferable right.
